A double modular classroom is being installed at Claycots Primary School, Slough for a period of 18 months.
These modular classrooms are being delivered and installed within three weeks of the request. The two five-bay bulge classrooms come complete with air conditioning, heating and is data and intruder linked.
Claycots requested a level access facility which will see McAvoy utilise ramps and steps with the use of jackpads.
The tough, durable nature of McAvoy Group’s portable buildings makes them an ideal solution for the demanding needs of a classroom. The additional classroom space will provide the perfect environment for both staff and pupils.