Neath Port Talbot County Borough Council (NPTCBC) had an urgent requirement to increase education space across multiple schools within the local authority area including Blaenhonddan Primary School, Ysgol Hendrefelin and Crymlyn Primary School.
Construction of the new Orsett Heath Academy in Essex was commissioned by the Secretary of State for Education and procured through the Department for Education (DfE) Construction Framework, which was the third direct award for McAvoy under the framework and the 27th new school facility delivered by McAvoy for the DfE.
The Department for Education (DfE) had a requirement for temporary facilities across four schools due to the discovery of Reinforced Autoclaved Aerated Concrete (RAAC).
The Department for Education (DfE) had a requirement for a temporary classroom facility at The Bromfords School, following the closure of one of its buildings due to the discovery of Reinforced Autoclaved Aerated Concrete (RAAC).
As part of a new industrial zone in Dublin, our client had a requirement for a modern security building which will be used by both security personnel and visitors. The building needed to be functional, aesthetically pleasing, and completed within a tight timeframe to align with the operational launch of the industrial zone.
The newly developed Family Resilience and High Needs Centre, located in North Birkbeck, London, serves as a vital community space dedicated to providing support to some of the most vulnerable children in the Borough.
The Queen Elizabeth Hospital King's Lynn NHS Foundation Trust engaged McAvoy, a leader in offsite modular manufacturing, to design and deliver a two-storey facility using its innovative SmartCare® modular solution.
Due to anticipation of a population surge following plans of a new housing development nearby, Surrey County Council had an urgent requirement for additional school places within the area.
McAvoy delivered 73 SmartClass® modules within just 17 weeks from installation of the first module, with 70% of the work completed at its purpose-built 70,000 sq ft manufacturing facility.